110KV HIGH VOLTAGE UNDERGROUND LINE

Modification of the existing 110 kV overhead line, by changing it to an underground line in the sections that run through urban centers. Iplan has carried out the drafting of the executive and construction project, Construction Management and the legalization, of a 110 kV double circuit, 1200 mm2 aluminum section, 1.63 km long underground line, located in the municipalities of Sant Joan Despí and Cornellá de Llobregat.

Start typing and press Enter to search