EXECUTIVE PROJECT AND TECHNICAL ASSISTANCE FOR THE INSTALLATION OF UPSS

Executive project preparation and drafting, as well as technical assistance, for the 8 UPS’s replacement located in 4 different TMB facilities in Barcelona. In each of the facilities, 2 x 120 kVA sets will be installed to replace obsolete technology equipment.

Start typing and press Enter to search